Highway No. 21, Control Section 0302, Muang Khom – Khlong Krachang, Section 4
Between Km. 60+248 to Km. 63+278 (Right Side)
Work Volume: 1 location (31,397 sq.m.)
Contract No.: LB.2/(SOR.)/30/2568 dated January 30, 2568 (2025)
Contract Start Date: January 31, 1968 (Note: Likely a typo – should be 2025)
Contract End Date: April 30, 2025
Duration: 90 days
Project Value: 14,973,609.49 THB